Monday, September 21, 2015

Laborers for Christ Project-Bethlehem Lutheran Church, Milan, WI

We arrived at our Laborers for Christ project in Milan, WI (central part of the state about 30 miles west of Wausau) on Saturday, May 16.  Will be helping Bethlehem Lutheran Church, Milan, WI built a new church. During the week some church volunteers come out, but on Saturdays more are able to come out.
 
 
Site with construction trailer

Inside of construction trailer

 
Eventually, there will be 7 couples on the project parked at the construction site. One lady is “laboring” but the rest of the ladies will be the “support team” and periodically do some volunteering.   The work days are Tuesday-Saturday from 7-4. 

It's great to have a washer and dryer provided.  A close line was also provided.

 
Every morning we gather together at 9:30 and have snacks (provided by the congregation) and a devotion (everyone takes a turn giving the devotion).  We have "AA (Attitude Adjustment)" around 4:00 every afternoon and on Thursday or Friday night we go out and eat together.  Most Saturday's the congregation also provides lunch.
 
May 19
A cold front blew in over the weekend and when the project started this morning it was 32, wind-chill of 25, and light sleet and snow. 
 


May 20
Work days are Tuesday-Saturday from 7am-4pm.  Some church members come out during the week to assist, but Saturday is the big "church volunteer" day. 
 
 
 

 May 21



 

 
May 22

May 23
About 23 church volunteers came to work and help in a variety of ways.  By the end of the day the pressed board and Tyvek had been put on all three sides.  Amazing progress for a week of work!












May 26
Work on the interior walls

LCEF sign arrived and prepared to be displayed by two church members.


May 27
 

 
 May 28

May 29




 
May 31
At worship the Laborers that had arrived were "commissioned".  Three others will arrive soon.
 
June 2



 
 June 3




 
 I happened to see an Amish farmer pass by the construction site.  He's moving a piece of farm equipment with 3 draft horses.  The car tow-dolly in front provides an interesting contrast.
 
June 4
 


 
June 5
 


Trusses being delivered





Trusses literally rolled off the truck




 
June 6



 
Everything is starting to green up
 
June 7
All the laborers have arrived
 
 June 8
Trusses being raised






Storm on the way

Pea size hail

Work continued after storm passed

 
 June 9
 
  Praying?  Maybe, but also talking with guys in the lift in the above picture







 
June 10



Church members and other volunteer help out in a variety of ways








Supports for carport


 
Unloading metal roof boxes


 
June 11




 
June 12
 
Volunteers having a good time building the church
 
 
 June 13





 
June 16


 
June 17

 
 June 18
This is what you call teamwork






 
June 19

 
 
 
June 20



 
June 23
 
 


 
June 24

Much different than the way concrete work is done in the south






 
June 25
Taping the windows
 
Installing the windows


 
 
 



 
June 26




Amish horse and buggy going down the road next to the building site
 
June 30
Working on the lights
 
Working on the window trim

 
Working on siding and installing lights

 
 July 1
Sanctuary


Bathrooms
 
July 2
Doors Arrive

 
July 3
Work continues on the sanctuary

 
 July 7


 
July 8

 
July 9



 
July 10


 
 July 11
Many volunteers helped with the siding




 

 
Lunch was provided by Bethlehem's sister congregation St John

 July 13
The stain glass star was set.  The "Bethlehem" star was designed as the logo for Bethlehem Lutheran


 
 
July 15
More work continues on the outside and inside 




 
July 17
Works continues in the front left of the sanctuary
 
Ramp on left side of altar

Lights being installed in the sanctuary
 
 
Work on the outside continues

 
July 21
Preparing car port posts for metal covering
 
Entry doors installed



 
July 23

One of the laborers working in our small garden

Farm next to the project site chopping hay and blowing in silo


 
Soybean field next to project site
 
 
 July 25
Metal work on carport and cross on sanctuary window completed

 
July 28
Siding on west side completed
 
Foam insulation being installed


 
 
 July 29
Remainder of door frames arrived

 
August 2
 
August 12
Ceiling Insulation in Classroom
 
Ceiling Insulation in Sanctuary
 
HVAC work continues
 
August 14
One truck of drywall delivered 

 
 
August 15
HVAC work continues
 


 
Vapor barrier being installed in preparation for drywall


 
 
 
 
August 18
Old manure spreader is being used as a dumpster for the sheet rock scrap.  A member of the congregation will spread the sheet rock on his field.


 
August 21
 


 

 
August 22

 
August 25


 
August 26




North side finished
 
August 29
Sheet rock work completed




Work on east side of the church
 
 September 1



September 2






 
 September 3




 East side


September 5

 
 
 
September 9
 








September 10





 
September 15



Clothes line
 
Scrap wood truck
 
Recyle and garbage trailer

September 16
Ceiling tile being delivered
 








 
September 17



 September 19
Covering sanctuary floor in preparation for paint spraying



Work on room in balcony



 
Electrical work
 
Tile in men's bathroom
 
Sink in women's bathroom
 
We departed the project on Monday, September 21.  Two other laborers will remain for a week or so.  The remaining work will be completed by members of the congregation.  Dedication is planned for Sunday, October 18.  It was such a blessing to be in Milan and assist Bethlehem Lutheran Church build their new facility.  We look forward to returning to see the completed project.

Tuesday, September 1, 2015

Steam & Gas Engine Show-Edgar, WI

The 42nd Annual North Central Wisconsin Antique Steam & Gas Engine Club Show was held on the Kurt Umnus Farm in Edgar, WI.  In addition to the antique engines there was also a flea market and of course lots of food.  The 3 day event is attended by approximately 16,000 people.  We worked with other members of Bethlehem Lutheran Church and St John Lutheran Church at the Main Gate collecting entrance fees and putting on wrist bands.  It was a fun time!!





















Sunday, August 23, 2015

Athens, WI Parade

Bethlehem had a float in the Athens Parade on Sunday, August 23.  Members of Laborers for Christ participated with other members of the church.


Tuesday, August 4, 2015

North Shore of Lake Superior - Minnesota

We had a few days off from our "laborers project" so we enjoyed a trip to Duluth and the North Shore of Lake Superior.  We spent most of our time at Two Harbors and Grand Portage.

Duluth, MN
View of Duluth and Lake Superior from Scenic Overlook


Two Harbors, MN
From the late 1880's through the early 1900's, Two Harbors was the busiest port and transportation hub north of Duluth.  At that time iron ore, timber and fishing were their heyday.  Today it is still a busy harbor community.

Ore boat ship in  Agate Bay

 
Crusader II Fishing Boat

 
 
The Two Harbors Light Station is the oldest operating lighthouse in Minnesota.

 
Split Rock Lighthouse Historic Site
The light station was active from 1910 until 1969.  It was built in response to a storm that occurred November 28th, 1905 which claimed 29 ships and several lives. Through the years it served at a vital aid to navigation to iron ore carriers carrying shipments across western Lake Superior from iron ranges in northern Minnesota to the lower Great Lakes.  Accessible only by water 1925, the lighthouse has stood majestically over Lake Superior for over 100 years.
 

Grand Portage National Monument, MN
The monument is located on the Grand Portage Indian Reservation, seven miles from the Canadian border.  From 1784 to 1803 Chief Director Simon McTavish and his North West Company partners ran the most profitable fur trade operation on the Great Lakes.  The company's inland headquarters was located at Grand Portage, the largest fur trade depot in the heart of the continent.  The Voyageurs-French for "travelers" carried two 90-pound packs along with the 8 1/2 mile portage between Lake Superior and Fort Charlotte, the company's smaller storage depot on the Pigeon River.



Birchbark Canoe
Were it not for the lightweight, speedy birchbark canoe, an invention of the region's Indians, North America's fur-trading empire would not have existed on such a vast scale. 



 
Views from Mount Rose-300 feet above the Stockade and Great Hall
 
Objibwe Village
 
Fur press converted bulky furs into easily handled cargo. 
 
Stockade and Great Hall